The project
This project wasn't originally planned as a major renovation. A refrigerator water-line failure went unnoticed for two days, causing more than $50,000 in damage.
What began as an unexpected restoration project grew into a much larger renovation as the homeowners took the opportunity to rethink additional areas of the home.
One of the most significant transformations was the primary bathroom. A full wet-room design placed a freestanding tub inside the shower area, creating an open, spa-inspired space. An unusual ceiling-mounted tub filler became one of the room's signature features.
Project type
Water-Damage Restoration / Whole-Home Renovation
Project scope
Home built in 1981 Refrigerator water-line failure Two-day water loss More than $50,000 in damage Project expanded into whole-home renovation Major primary bathroom renovation Full wet-room design Freestanding tub located within shower/wet area Ceiling-mounted tub filler